Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Utah Launches First-Ever AI Prescription Pilot in the U.S., Sparking Debate on Safety and Innovation

    January 13, 2026

    EU Widens Tech Crackdown, Targeting Musk’s Grok and TikTok Over Alleged AI Law Violations

    January 13, 2026

    Malicious Chrome Extensions Compromise 900,000 Users’ AI Chats and Browsing Data

    January 12, 2026
    Facebook X (Twitter) Instagram
    • Tech
    • AI News
    Facebook X (Twitter) Instagram Pinterest VKontakte
    TallwireTallwire
    • Tech

      Malicious Chrome Extensions Compromise 900,000 Users’ AI Chats and Browsing Data

      January 12, 2026

      Wearable Health Tech Could Create Over 1 Million Tons of E-Waste by 2050

      January 12, 2026

      Viral Reddit Food Delivery Fraud Claim Debunked as AI Hoax

      January 12, 2026

      Activist Erases Three White Supremacist Websites onstage at German Cybersecurity Conference

      January 12, 2026

      AI Adoption Leaders Pull Ahead, Leaving Others Behind

      January 11, 2026
    • AI News
    TallwireTallwire
    Home»AI News»OpenAI, Oracle & SoftBank Double Down on U.S. AI Infrastructure with Five New Stargate Data Centers
    AI News

    OpenAI, Oracle & SoftBank Double Down on U.S. AI Infrastructure with Five New Stargate Data Centers

    Updated:December 25, 20254 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    OpenAI, Oracle & SoftBank Double Down on U.S. AI Infrastructure with Five New Stargate Data Centers
    OpenAI, Oracle & SoftBank Double Down on U.S. AI Infrastructure with Five New Stargate Data Centers
    Share
    Facebook Twitter LinkedIn Pinterest Email

    OpenAI, Oracle, and SoftBank have just announced they will build five new AI data centers across the U.S. under their joint “Stargate” infrastructure push, aiming to accelerate the expansion toward a total capacity of 10 gigawatts and $500 billion in investment. Sites will include Shackelford County, Texas; Doña Ana County, New Mexico; one undisclosed Midwest location (all three with Oracle), plus Lordstown, Ohio and Milam County, Texas (in partnership with SoftBank). The announcement, made from OpenAI’s flagship facility in Abilene, Texas, brings Stargate’s planned capacity close to 7 gigawatts and about $400 billion in committed funding, with more sites to be evaluated. The centers are expected to generate over 25,000 onsite jobs; the partners are already deploying Nvidia chips in early facilities and are moving fast to meet their timeline.

    Sources: Financial Times, Reuters

    Key Takeaways

    – The Stargate initiative is scaling rapidly: with these five new centers, the project is approaching ~7 gigawatts of planned capacity and ~$400 billion in committed investment, moving toward the full 10 GW / $500B target.

    – Strategic partnerships are key: Oracle is involved in three of the announced new sites, SoftBank in two, showing how OpenAI is leveraging external infrastructure, energy, and design expertise.

    – Local and environmental implications matter: large data centers mean jobs, power usage, and water demands; in Texas especially, water scarcity and energy infrastructure will likely become more prominent concerns.

    In-Depth

    Over the past few months, talk of AI has quite literally moved from algorithms and models to the physical backbone that powers them — data centers, power, cooling, and chips. The Stargate project, a joint venture among OpenAI, Oracle, and SoftBank, is shaping up to be perhaps the most ambitious example. Originally announced in January as a $500 billion, 10-GW U.S. AI infrastructure commitment, Stargate is now making sweeping moves to lock in much of that scale. With today’s announcement of five new sites, the partners bring planned capacity close to 7 gigawatts and investment committed to around $400 billion. 

    Of the five new centers, three are in collaboration with Oracle (Shackelford County, Texas; Doña Ana County, New Mexico; and an unnamed Midwest site), and two with SoftBank (Lordstown, Ohio; Milam County, Texas). These selections reflect a balancing act: Oracle brings cloud infrastructure and operational scale, SoftBank adds energy and build expertise — especially useful where rapid build + power delivery + favorable permitting matter. The Abilene, Texas flagship site, which was already under construction, serves as both symbol and test bed: it’s already hosting Oracle Cloud infrastructure and Nvidia chips, one of the early active nodes in this sprawling network. 

    From an economic perspective, the announcement promises more than just server racks. Over 25,000 jobs are expected on site across these new data centers, with additional downstream or supply chain employment. Local communities will benefit from construction spending, infrastructure investment, and tax revenues. But that comes with trade-offs. Power demand is enormous; cooling and water usage are key concerns, especially in places like West Texas, which already face heat stress and water scarcity. The announcement tries to address some of these environmental concerns — for example describing cooling systems with closed-loop designs, and noting that after initial fill the water demands taper. Still, skeptics will want detailed plans: how energy is sourced (renewables vs fossil vs grid expansion), how local ecosystems are protected, and how infrastructure (roads, transmission, water) will scale.

    One of the most interesting non-technical challenges here is financing and timing. Stargate is using partners and leveraging capital from firms like Oracle and SoftBank, plus deals for GPUs (notably with Nvidia) to supply the hardware backbone. But aligning real estate, permitting, power capacity, cooling infrastructure, and local regulatory approvals at scale is historically slow. Announcing five sites is one thing; getting full build-out, operation, and efficiency at scale is another. If the partners can deliver on their timelines, the U.S. could solidify its lead in AI infrastructure — but missteps could leave gaps (in energy, environmental acceptability, or delays) that competitors might exploit.

    In short: Stargate is no longer a concept. It’s turning into a concrete campaign to define how the U.S. builds its AI future — physically, economically, and environmentally. Its success or failure will depend on execution, on balancing the urgent need for computing scale with the less glamorous but critical realities of energy, water, local impact, and logistics.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleOpenAI Opens ChatGPT to Third-Party Apps via New SDK to Turn Chatbot Into App Platform
    Next Article OpenAI Poised to Unleash Sora 2—Potential AI Video Game-Changer

    Related Posts

    EU Widens Tech Crackdown, Targeting Musk’s Grok and TikTok Over Alleged AI Law Violations

    January 13, 2026

    Utah Launches First-Ever AI Prescription Pilot in the U.S., Sparking Debate on Safety and Innovation

    January 13, 2026

    Microsoft Warns of a Surge in Phishing Attacks Exploiting Misconfigured Email Systems

    January 12, 2026

    Malicious Chrome Extensions Compromise 900,000 Users’ AI Chats and Browsing Data

    January 12, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks

    Malicious Chrome Extensions Compromise 900,000 Users’ AI Chats and Browsing Data

    January 12, 2026

    Wearable Health Tech Could Create Over 1 Million Tons of E-Waste by 2050

    January 12, 2026

    Viral Reddit Food Delivery Fraud Claim Debunked as AI Hoax

    January 12, 2026

    Activist Erases Three White Supremacist Websites onstage at German Cybersecurity Conference

    January 12, 2026
    Top Reviews
    Tallwire
    Facebook X (Twitter) Instagram Pinterest YouTube
    • Tech
    • AI News
    © 2026 Tallwire. Optimized by ARMOUR Digital Marketing Agency.

    Type above and press Enter to search. Press Esc to cancel.